Electric Drive requires 3-phase,
100 amp supply, earth and neutral on a dedicated circuit
via a residual current device and should be fitted by a
qualified electrician.
Supply cable must
not exceed 25 meters in length and be a minimum 25mm core.
Throughput per
hour assumed 5% moisture reduction from 21% to 16%. Includes
loading, heating, cooling and unloading time.